1708#, No. 1 building, Lane 2742, Pudong Avenue Road, Pudong, Shanghai
Home ProductsBottle Washing Machine

6000-8500 BHP Bottle Washing Equipment

Good quality Beverage Filling Machine for sales
Good quality Beverage Filling Machine for sales
I have cooperated with this company for over 3 years, I like their products which is popular with our customers and trust their service.

—— David

I receive your products, they are all good. Keep in touch!

—— William

I'm Online Chat Now

6000-8500 BHP Bottle Washing Equipment

China 6000-8500 BHP Bottle Washing Equipment supplier
6000-8500 BHP Bottle Washing Equipment supplier 6000-8500 BHP Bottle Washing Equipment supplier

Large Image :  6000-8500 BHP Bottle Washing Equipment

Product Details:

Place of Origin: Shanghai China
Brand Name: Higee
Certification: CE ISO
Model Number: HG-XP

Payment & Shipping Terms:

Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Wooden case
Delivery Time: 30 working days
Payment Terms: L/C, T/T
Contact Now
Detailed Product Description
Name: 6000-8500 BHP Bottle Washing Machine Packaging: Bottles
Driven Type: Mechanical Voltage: 220v/380v/415v/440v
Capacity: 6000-8000BHP Bottle Height: 180-350mm
Dimension: 4300X3200X1300mm Cetification: CE
High Light:

automatic bottle cleaning machine

,

industrial bottle washer

 

 

6000-8500 BHP bottle washing machine and vial washing machine with rotary bottle washing machine and mini portable wash

 

 

Application

 

1.Recycling bottles need to be cleaned entered into transportation system by the vertically arranged via dial wheel coming into soaking machine, dial wheel interval pushed 10 bottles into the machine to soak.
2.soaking machine interval movement dialing bottle inlet, the bottles accept soaking through spraying and high temperature hot alkaline water by soaking machine,soaking time is about 10 minutes.
3.the bottles is soaked changes in the different temperature , this process can remove bottle label paper and precipitation dirt in the bottle ,the bottles is repeatedly soaked in the soaking machine.
4. coming into the outer brushing machine automatically and accept outside bottle brushing machine washing and brushing the bottles.
5. the bottles can directly enter into the rinsing and draining machine, where the inside of the bottle is injected into the warm water then accept the bottle brushing and cleanin for the second time.
6. then through high pressure backwashing, then overturned and drained vertically into conveyor system and filling machine.
 

Working procedure

Bottle entering →soaking→outer brusing→inner brushing→cleaning water spraying and washing →drying→bottles come out

Note:the temperature of hot water containing soda: 50-55℃, concentration of water containing soda is about 2.5%

 

Washing part machine photo

 

6000-8500 BHP Bottle Washing Equipment

 

6000-8500 BHP Bottle Washing Equipment

6000-8500 BHP Bottle Washing Equipment

 

 

Our Services 2
1.installation, debug
After equipments reached the workshop of customer, place the equipments according to plane layout we offered. We will arrange seasoned technician for equipments installation, debug and test production at the same time make the equipments reach the rated producing capacity of the line. Time for installation and debug is 15-25 days.
 
2.training
 
Our company offer technology training to customer. The content of training is structure and maintenance of equipments, control and operation of equipments. Training is in the workshop of customer. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures.
 
3.Quality guarantee
 
We promise that our goods are all new and not used. They’re made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.
4.After sales
 
1,After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.
2,After quality guarantee, we offer technology support and after sales service. Offer wearing parts and other spare parts at favorable price; after quality guarantee, the technician of buyers should operate and maintain the equipments according to seller’s demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician.

Contact Details
Higee Machinery (Shanghai) Co.,Ltd

Contact Person: Mrs. Lotus

Tel: 86-21-20235868

Send your inquiry directly to us (0 / 3000)